GBPLUS NEWS | CHECK-IN AT THE TOP OF TOWER CT1, IEC RESIDENCES VINH PHUC (FLORA CERA GARDEN)

Location: Penthouse Roof Level, Tower CT1 – IEC Residences Vinh Phuc Project

Status: Penthouse roof concrete pouring officially underway – Ready for the Topping-Out Ceremony!

ACCELERATING FOR A BREAKTHROUGH – HEADING TOWARDS THE TOWER CT1 TOPPING-OUT CEREMONY

Following days and nights of tireless effort and unwavering determination from the Project Management Team, alongside our dedicated engineers and site workers, GBplus is officially pouring concrete for the penthouse roof level of Tower CT1—marking the crucial final milestone in preparation for the upcoming Topping-Out Ceremony!

All construction activities are being executed with the utmost urgency. The site team is channeling maximum momentum, determined to complete this crucial milestone in preparation for the project’s grand TOPPING-OUT ceremony.

COMMITMENT TO QUALITY – SAFETY – SCHEDULE

The concrete pouring of the penthouse roof level, as well as every construction phase at the top of the tower, is strictly monitored by GBplus in terms of technical standards and Occupational Safety procedures. We are focusing maximum resources to ensure absolute adherence to Quality – Safety – Schedule standards, bringing the project to a successful finish as committed.

GBplus would like to extend our sincere gratitude for the close companionship and support from the Investor, IEC, as well as the dedication and perseverance of every engineer and worker on site.