🔰 After more than two months of resuming construction activities following the lockdown period, the ZeitGeist Metrocity Nhà Bè (ZMC.NB) project team is entering a critical phase to ensure progress and meet the 2021 schedule.
Currently, the project has completed 100% of the reinforced concrete structure for the Clubhouse package in Zone A31, including the swimming pool, septic tank, underground water tank, and over 60% of the reinforced concrete structure for the Semi-Villa package. At the current pace, the project is expected to complete all structural works for the semi-villas by January 2022, prior to the Lunar New Year holiday in 2022.
🔥 This phase has faced significant challenges due to the impact of the Covid-19 pandemic. Alongside maintaining strict pandemic control, the GBplus project management team has developed timely plans to overcome difficulties, meet progress requirements, and ensure construction quality.
Under the close supervision of GS Project Management and the main contractor Viko, and with GBplus’s intense focus and rapid construction pace, the project has maintained an enthusiastic and bustling atmosphere despite overnight work and challenging weather conditions with frequent rains. At the current rate, all structural works for the semi-villas are expected to be completed by January 2022, before the Lunar New Year holiday, with the entire project set to be completed and handed over to the investor by April 2022.
🍀 The ZeitGeist Metrocity Nhà Bè project spans an area of 349.36 hectares, situated on prime land along Nguyễn Hữu Thọ Street, covering Nhơn Đức and Phước Kiển communes in Nhà Bè District. The project is developed by GS Nhà Bè – Quận 7 Co., Ltd. (GS Korea) with VIKO P&C as the main contractor. Currently, ZeitGeist Metrocity City is the largest urban area in Nhà Bè District and ranks second in size after the Southern Saigon area.
#GBplus #GBcons #ZeitgeistMetroCityNhaBe #UnderConstructrion #December2021 #AlwaysForward #WeAreGreenBuilding #ClubHouse #SemiVilla